Basement Bar

  • After a sand, more stain, and sitting a few hours - looks much better
  • Stained Bar Top
  • First coat of Spar Marine Varnish.
  • Stretching Carpet with the Knee Kicker 1 comment
  • The tappers are working, the sink is not 2 comments
  • The Countertop is Done.  Next, bar top and plumbing.
  • Dry Fitting the oak-ply-wrapping
  • Dry Fitting the oak-ply-wrapping
  • They love each other, haha 1 comment
  • Sweating My Pipes
  • As I was mounting the other pipes to the wall - I decided I should fix these ugly sump pump pipes...
  • See all that water?  I just put that ice pick right through the PVC - The photo doesn't do the am...
  • The hole I put in my Sump Pump PVC
  • Got the top mostly cut out
  • Routing out the inside corner
  • Screwing the Pocket Holes
  • Top - Trimmed Out
  • Bar Top sitting on the frame 1 comment
  • Bar - Finished 4 comments
  • The Rio bar served (many of) us well

Some photos of the bar I'm slowly starting to build in my basement.

Photos taken from July, 2007 to April, 2016 in Ankeny, Iowa

Album added 17 years ago (Feb 8, 2007).